Friday, September 11, 2009

Kitchen, tub, door, number, floor - Sept. 11th





Quick trip, lots going on. The kitchen is being installed - I will wait until tomorrow to add kitchen pictures. My tub has arrived. It took 4 men to lift the tub. The house number is in. Front door installed, to be painted later. Floating floor in the basement. It is all coming together. Till tomorrow.

No comments:

Post a Comment